Penmann successfully delivered a complex HVAC upgrade at Nutricia’s Liverpool facility, supplying a purpose-built ventilation and climate control system engineered to meet stringent hygiene and production criteria. The contract included the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://artybookmarks.com/story20472685/penmann-completes-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2